Can Weak Manchin Permitting Bill Be Strengthened?

After authorizing $370 billion in new funding for new, cleaner energy sources, Congress is turning to permitting reform: All the money in the world will not help if projects don’t have permission to build. Wednesday evening, Senator Manchin released proposed text for his permitting bill, which he apparently negotiated in return for his vote to authorize the energy funding. Unfortunately, the bill is not well-designed to speed up construction of new energy sources. But with a few strategic additions it could go a long way toward speeding up permitting to secure a cleaner, more reliable, and affordable energy future for the United States.

The biggest roadblock to energy sources is not financial; it is receiving permission to build. And many of the projects that we most need for a clean energy transition face particular permitting difficulties because they need permits from multiple states or local communities and the federal government. Our traditional energy commodities, oil and coal, are less dependent on building long-distance infrastructure because they can rely on existing railroads and pipelines, and they are easier to ship by multiple pathways using rail, road, and water transport. By contrast, cleaner energy products such as renewable electricity, natural gas, and hydrogen can only be shipped by new long-distance infrastructure.

Think of a long-distance power-line designed to bring renewable energy to market, a pipeline shipping natural gas to communities hoping to move away from coal, or a hydrogen pipeline designed to help replace fossil fuels. These linear infrastructure projects often need approvals from each state they cross and may also need approval from the federal government as well whenever they cross federal lands, borders, or streams.

There are two huge legal permitting challenges for these new cleaner energy projects.

So if we want to clean up our energy system and address the global energy crisis, which is causing energy shortages and price spikes around the globe, we need to speed up permitting. If the $370 billion authorized by Congress just goes to the few projects that would already have passed the permitting gauntlet, it will be money wasted. So we’ve seen a growing chorus of voices demanding reform to the permitting process to ensure this money isn’t squandered and that we can build a cleaner energy future.

The federal and state permitting challenges are linked because perhaps the most common proposal to speed permitting is to replace state and local siting processes with federal processes. For example, in 2005, the U.S. Congress gave the federal Department of Energy the power to designate areas that particularly needed more electricity transmission and gave the Federal Energy Regulatory Commission power to, in some circumstances, permit power-lines that hadn’t been approved by the states in those areas. Senator Manchin’s bill leans heavily on this method of speeding permitting: it gives federal government more power over permitting new power-lines and hydrogen pipelines.

The problem is that this is not an improvement at all when federally-approved projects are facing Kafkaesque challenges when they seek approval to actually build their projects. The energy sector where federal permitting is most common is in interstate natural gas permitting and these projects are routinely stopped by local objections even when they have federal approval. In fact, the two highest-profile recent gas pipeline projects—the Atlantic Coast Pipeline and the PennEast Pipeline—eventually had to give up on building their projects after years of expense and struggle, even though the federal government repeatedly backed both pipelines and both pipelines won blockbuster decisions in the U.S. Supreme Court.

If the Manchin bill passes as is, the gas pipeline industry can welcome the power-line and hydrogen industries to national regulation with this unwelcome news: “Even if the federal government backs you on every permit, and even if the Supreme Court backs you in every decision, no matter how long you wait, or how much you spend, states and lower courts will make life so difficult that your proposed project will never be built.”

The dysfunctions of federal permitting under court review are well known in energy policy. Congress’s 2005 grant of power to the Department of Energy and the Federal Energy Regulatory Commission was eviscerated by two federal appeals court decisions over the next six years. This is why the single project that really will be helped by the current Manchin proposal is the Mountain Valley Pipeline. The bill makes special provision for this project, directing that all actions “necessary for the construction and initial operation at full capacity of the Mountain Valley Pipeline shall not be subject to judicial review.”

The Manchin bill does almost nothing to help other energy projects stop endless court demands for further environmental review. The bill does address some less important timing issues so it’s important to keep straight three kinds of time limits:

  1. Time limit for the federal government to complete environmental review. The proposal directs a two year limit for environmental review of major projects and a one year limit for minor projects. Unfortunately, such deadlines are unenforceable—the federal government routinely misses even the statutory deadlines it is trying to meet. The deadlines may even be counterproductive if they encourage courts to stop projects and order further reviews because of concern that review was rushed to meet an artificial deadline.
  2. Time limit for plaintiffs to challenge a project after it receives its permit. This kind of “statute of limitations” is not harmful but of very little use. Smart plaintiffs hoping to stop infrastructure generally sue at the earliest opportunity because the best chance to stop an infrastructure project is before construction begins. So big projects are almost never held up by plaintiffs that waited years after the project was approved to bring their lawsuit.
  3. Time limit for courts to order more review on projects that have already been under review for years. Unfortunately, the Manchin proposal does not put any time limits on courts’ ability to hold up nationally-approved projects other than the Mountain Valley Pipeline. The federal environmental review law, the National Environmental Policy Act (NEPA), is a procedural statute simply intended to ensure the government did sufficient environmental review of a project. If the federal government has been reviewing the environmental consequences of a project for years and has approved it, and the court would still like more review, the court can order the government to do more review. But it is not reasonable to make a nationally-approved project, and all the consumers and producers that depend upon it, wait for the court and government to reach agreement on how much environmental review is enough.

The crucial importance of a time limit on judicial delay of projects is well explained in the Institute for Progress’s excellent recent report on “How to Stop Environmental Review from Harming the Environment“:

The time limit that would likely have a major impact on outcomes is restricting the ability of the courts to issue injunctions against projects that have undergone extensive environmental review under NEPA. This change would provide developers the certainty they need to invest in large-scale build outs of solar, wind, transmission and other clean energy infrastructure. Without a time limit on judicial injunctions, developers have a sword of Damocles perpetually hanging over their head, threatening the entirety of the project.

As it stands, the Manchin permitting proposal would be a serious lost opportunity that would be unlikely to significantly speed up construction of new energy projects. The focus on federalizing review of clean energy projects is particularly unhelpful when the proposal doesn’t address the problems that are making federal review the bane of energy project developers.

The good news is that the Manchin proposal could be improved relatively simply if it added limits on federal court and state delays on federal projects. Speeding up permits for nationally-approved projects would accelerate construction of all the new energy projects that it designates for federal review.

Supreme Court: EPA Can’t Cap Greenhouse Gas Emissions From Power Plants

The Supreme Court just decided “the most closely watched environmental case in decades,” West Virginia v. U.S. Environmental Protection Agency. In the 6-3, opinion, the Court holds that the EPA cannot use Clean Air Act §111(d) to set power-sector-wide greenhouse gas emissions standards for state power plants. The Court also explains that the Major Questions Doctrine is crucial to this analysis and reflects both “separation of powers principles and a practical understanding of legislative intent.”

A Justice Gorsuch concurrence, joined by Justice Alito, lays out their view of history and application of clear statements doctrines and the major questions doctrine specifically. Justice Kagan wrote a dissenting opinion, joined by Justice Breyer and Justice Sotomayor.

The opinion can be found here: https://www.supremecourt.gov/opinions/21pdf/20-1530_n758.pdf

As a reminder, here is a summary of how the case got to the court from a blog post and webinar I did last December, in anticipation of the Supreme Court argument:

Under the Clean Air Act, the Environmental Protection Agency regulates greenhouse gas emissions from various sources including new cars and new industrial sources. But a large proportion of the country’s greenhouse gas emissions come from existing sources, such as the nation’s coal and natural gas power plants, which provide over half of American electricity.

In 2015, the Obama administration issued a regulation for existing fossil fuel power plants under Clean Air Act §111(d), which allows the EPA to “establish a procedure” for each state to adopt “standards of performance” for existing sources of air pollutants. The administration called this rule the “Clean Power Plan.” It was controversial, in part, because it went beyond asking states to make their existing power plants run more efficiently. Instead, it went “beyond the fenceline” of the power plant to encourage non-fossil sources of electricity such as wind and solar power and shrink the fossil-fuel power sector.

The Clean Power Plan never went into effect because the Supreme Court stayed its implementation on February 9, 2016. The D.C. Circuit heard more than 7 hours of argument on the validity of the Clean Power Plan but never ruled on it because the Trump administration repealed it and replaced it with its own rule, which it called the “Affordable Clean Energy Rule,” and was limited to promoting efficiency measures at existing fossil fuel plants. The D.C. Circuit then heard 9 more hours of argument on this new rule, before striking it down on January 19, 2021. The court held that EPA’s authority was not so limited.

The Supreme Court granted certiorari to decide whether Clean Air Act §111(d) gives “the EPA authority not only to impose standards based on technology and methods that can be applied at and achieved by that existing source, but also allows the agency to develop industry-wide systems like cap-and-trade regimes.” The case is an important sequel in the Court’s lines of cases on how much deference executive agencies should receive to decide major questions of policy and whether Congress might authorize dramatic agency action from relatively obscure provisions—hiding an elephant in a mousehole.

The opinion can be found here: https://www.supremecourt.gov/opinions/21pdf/20-1530_n758.pdf

The Supreme Court emphasized that “the only interpretive question before” it was “narrow”: “whether the ‘best system of emission reduction’ identified by EPA in the Clean Power Plan was within the authority granted to the Agency in Section 111(d) of the Clean Air Act.” Some had thought it might explicitly limit the Chevron doctrine or return to the non-delegation doctrine. This is a narrower ruling, but may rule out some of the more aggressive steps the Biden administration might have considered to reduce sector-wide greenhouse gas emissions in areas such as utilities, refineries, and oil and gas development.

Energy Tradeoffs Podcast #40 – Doug Kysar

This Thursday’s EnergyTradeoffs.com podcast is our 40th episode! It features Yale Law School’s Doug Kysar talking with University of Colorado’s Sharon Jacobs about his research on “Tort Law & Climate Litigation.”

Sharon and Doug first discuss the different types of climate litigation, including causes of action based on nuisance, arguments that the government holds the climate in trust for future generation, and claims that fossil fuel companies have misled investors and the public about the dangers of climate change. They go on to discuss the challenges of holding companies liable when greenhouse gas emissions were also caused by consumers around the world, and how that may prevent or dissuade judges from allowing these suits to go forward. Finally, they discuss the remedies that the various plaintiffs are looking for to protect them from climate harm.

The conversation builds on a 2017 article that Doug and Henry Weaver published in the Notre Dame Law Review, which was titled “Courting Disaster:  Climate Change and the Adjudication of Catastrophe.”

The Energy Tradeoffs Podcast can be found at the following links: 
Apple | Google

Climate & the Courts: Juliana Oral Arguments

How much can the federal courts do on a climate change? If you want more climate regulation than Congress is willing to provide, it’s an urgent question. The most recent and most ambitious climate lawsuit is Juliana v. United States, a lawsuit by children asking the courts to order the government to aggressively regulate carbon emissions. These plaintiffs argue that they have unwritten constitutional and federal common law rights to a stable climate and that the government must uphold these rights by imposing limits on private carbon emissions. The Ninth Circuit recently heard their argument and its upcoming decision will help define the outer boundaries of what the courts can do on climate change.

There has been no progress on federal climate legislation for ten years, since a 2009 cap-and-trade bill narrowly passed the House of Representatives and then died in the Senate. Since then, climate activists have pushed climate action in the courts, hoping to build on their major 5-4 victory in Massachusetts v. EPA, 549 U.S. 497 (2007), which held a) that states had standing to consider the government’s refusal to consider carbon regulations for cars under the Clean Air Act and b) that the government had to consider such regulations.

But in the ensuing decade climate efforts have largely been stymied in the courts, particularly in the Supreme Court:

The Juliana case will also likely prove fruitless in the end. The district court did initially allow the case to go forward and denied a government request for interlocutory appeal. But the Supreme Court again stepped in: it took the extraordinary step of first staying the case and then, while lifting the stay, suggesting it might reimpose it if the Ninth Circuit did not do so first. The Ninth Circuit then stayed the case and invited the district court to reconsider its decision on interlocutory appeal, which it did, allowing the appeal that was just argued in the Ninth Circuit.

The Supreme Court has already unanimously rejected federal common law climate claims. And it has already signaled its skepticism about this particular case. For this reason, some have suggested that it would be best for the plaintiffs to lose in the Ninth Circuit, because if the case goes to the current Supreme Court, the Court might well overturn its 2007 decision in Massachusetts v. EPA, or at least that decision’s holding on climate standing, which would be an even greater setback for climate regulation.

For an extremely helpful breakdown of the Juliana v. United States case and appellate arguments, as well as the likely results and implications, check out this Regulatory Transparency Project podcast.

Eminent Domain for Exporting Energy?

Eminent domain is the controversial exception to the general rule that no one can take your land without your consent. The Fifth Amendment to the U.S. Constitution allows the government to take your land for “public use” so long as it pays you fair compensation.

But what is a public use? Should pipelines and power-lines that help companies export energy to other states and countries count as a public use? Is it legitimate for states to let energy transport companies use eminent domain to serve the public in other states or countries?

This issue—”which public?”—is an increasing focus of litigation across the United States because many state laws and constitutions, like the federal constitution and federal laws, limit eminent domain to projects that serve a “public” purpose. At the same time, increasingly integrated North American energy markets mean that more and more electricity, oil, and gas are crossing state and national borders.

Just last Friday, the Iowa Supreme Court held that sending oil to neighboring states can count as a public use. But there is also a broad movement for a go-it-alone eminent domain policy, including court decisions in West Virginia and Kentucky that say out-of-state consumers don’t count as the “public.” And the D.C. Circuit is now considering a similar challenge to a natural gas pipeline that will allow some natural gas to be exported to Canada.

As I argue in this op-ed, it would have been a huge mistake for Iowa to adopt a go-it-alone eminent domain policy. Iowa has world-class wind power that will be most valuable if Iowa can export it to states like Illinois that have more people and less wind. A no-eminent-domain-for-export policy would have been terrible for Iowa.

More broadly, there are huge benefits from interstate and international energy trade. For decades, Canada has sent us affordable oil and cheap, clean hydropower. And states that have affordable oil and hydropower generally export to states that do not. If there was no eminent domain for export power-lines and pipelines, we all would be stuck paying more for dirtier energy.

And we need energy transport now more than ever. As I explain here, the U.S. is in the middle of three energy booms: history’s biggest oil rush plus more natural gas and more renewable power. Oil has many ways to get to market—pipeline, truck, rail, and boat—but natural gas and renewable power production depend on transport. Natural gas has environmental benefits if it can be piped to places that need to replace coal and oil. Solar and wind can provide cheap, clean energy if we build power-lines to take it to market. And new pipelines and power-lines would help American companies and landowners get more money for their gas and power. 

None of that will be possible, however, if go-it-alone state policies make it impossible to bring energy where it is needed. Landowners are rightly concerned about eminent domain and governments should reform the eminent domain process and offer more compensation to protect them as I suggest in my forthcoming Minn. L. Rev. article with Alexandra Klass. But ignoring interstate and international consumers is not a sensible reform and would cut off much of the promise of the new U.S. energy economy.

TransCanada Sues U.S. Government For Rejecting Keystone Pipeline

Courtesy of the <a href="https://www.aer.ca/about-aer/media-centre/photos">Alberta Energy Regulator</a>

Courtesy of the Alberta Energy Regulator

On Wednesday, TransCanada filed a complaint against the United States in a federal district court in Houston alleging that the President’s rejection of the Keystone XL pipeline was invalid and unconstitutional because it was not authorized by Congress. If successful, this claim would allow construction of the pipeline.

On the same day, TransCanada filed a notice of intent to submit a claim to arbitration under the North American Free Trade Agreement (NAFTA). Even if successful, this claim would not allow construction of the pipeline, but could entitle TransCanada to money damages from the United States. The company is asking for $15 billion in damages.

Like most private lawsuits against the government, these lawsuits face long odds, but both raise important and novel legal issues that will be difficult to decide. TransCanada’s constitutional claim could change the way that the United States approves international oil pipelines. And TransCanada’s NAFTA claim could endanger the United States’ long winning-streak in NAFTA arbitrations.

TransCanada’s Constitutional Claim

The most unexpected part of TransCanada’s legal salvo was the lawsuit that it filed asking a U.S. district court to rule that President Obama’s rejection of the Keystone XL pipeline was unconstitutional. TransCanada notes that Congress has never passed a statute that gives the President authority to reject international oil pipelines and says that, without such a law, the President had no authority for his unilateral rejection of the pipeline.

Congress has never provided a legal framework for regulating oil pipelines that cross the United States’ international borders. By contrast, there are laws that establish a process for the President to decide on international natural gas pipelines and electricity transmission.

In the absence of Congressional authorization, President Lyndon Baines Johnson simply issued an executive order in 1968, Executive Order 11423, that established a process for issuing permits to proposed oil pipelines that “would serve the national interest.” Then in 2004, President George W. Bush issued a new unilateral order, Executive Order 13337 that expedited review of border crossings. Both executive orders delegate decisions on these cross-border permits to the U.S. Secretary of State.

On November 6, the current Secretary of State, John Kerry rejected the Keystone XL pipeline after seven years of review. The official U.S. Record of Decision stuck by the State Department’s controversial previous conclusion that the pipeline would improve U.S. energy security, benefit the economy, and would be unlikely to increase greenhouse gas emissions in Canada. (It also suggested that the pipeline might even decrease greenhouse gas emissions in the United States by moving oil transport from railroads to pipelines, making oil transport more efficient.) But the U.S. concluded that the pipeline was ultimately not in the national interest because it could undercut the nation’s leadership in climate talks because the pipeline was “perceived as enabling further [greenhouse gas] emissions globally.”

TransCanada’s key argument is that, in the absence of any law, the President does not have unilateral authority to reject an international oil pipeline based on this kind of consideration. Although Presidents have claimed power to decide whether a pipeline is in the national interest since President Johnson in 1968, TransCanada argues that this power has never been fully tested because the President has never rejected an international pipeline.

This creates something of a puzzle: if Congress has never passed a law governing international oil pipelines and the President does not have authority to reject an oil pipeline, then who may, in fact, regulate pipeline border crossings?

One possible answer is that international oil pipelines are primarily regulated by the states, just like domestic oil pipelines. The U.S., unlike Canada, primarily relies on state-by-state regulation for interstate oil pipelines. That is, if no law has been enacted governing international oil pipelines, then the only laws that govern them are the same ones that govern domestic oil pipelines.

President Obama’s administration will raise several counterarguments. First, it will argue that the President has inherent and unilateral constitutional authority to control the nation’s borders, so he must have some kind of ability to control international border crossings. Second, if Congress has not established any criteria for the President to use in this decision, then he is free to create his own criteria. Third, President Johnson established this process almost fifty years ago and it has been frequently used to approve pipelines so Congress has, with the passage of time, acquiesced to this process. Fourth, federal district courts have upheld the President’s unilateral decision to approve international pipelines.*

TransCanada will respond that, whatever power the President has, it does not allow him to reject a pipeline based solely on international perceptions that are inconsistent with the government’s own environmental analysis. TransCanada’s complaint also argues that, far from acquiescing in the President’s unilateral authority to reject international pipelines, recent Congresses have repeatedly sought to constrain the President’s authority, citing Congress’s frequent attempts to approve the Keystone XL pipeline. Finally, TransCanada will point to federal court decisions and executive branch opinions from nearly a century ago, which concluded that in the absence of Congressional authorization the President had, at most, limited authority to control border-crossing facilities. Though old, these opinions may remain relevant in the unusual situation where, as with oil pipelines, Congress has not established a process for permitting border crossings.

The continuing saga of the Keystone XL drama overlaid with a tangle of old and new precedents and conflicting constitutional powers will make TransCanada’s U.S. lawsuit a case to watch. If a Republican is elected President this coming November, then the issue will likely be moot because the Republican contenders say they would reverse President Obama’s decision on the pipeline. But if not, then the U.S. courts will have to resolve the thorny issues raised by TransCanada.

TransCanada’s NAFTA Claim

TransCanada’s other action, its notice of intent to submit a claim to NAFTA arbitration, alleges that the U.S. discriminated against Keystone XL’s Canadian investors, violating its obligations to afford them national and most-favored-nation treatment under Article 1102 and Article 1103 of NAFTA. TransCanada also argues that by delaying a decision on the pipeline for seven years, and then denying it, the U.S. government destroyed the value of its investment, expropriating its property in violation of NAFTA Articles 1110 and 1105.

NAFTA claims are decided by three independent arbitrators. These arbitrators are not bound by the decisions of the arbitrators that decided previous claims. Thus, it is very difficult to predict whether a NAFTA claim will be successful.

If past cases are any indication, a Canadian company like TransCanada begins at a serious disadvantage. The United States has never lost a NAFTA decision to a foreign investor. And arbitrators have sometimes gone to great lengths to avoid a finding of discrimination. In one case, California passed a law that, it admitted, used “narrowly crafted language intended to prevent approval of a specific mining project” owned by Canadian investors. But the NAFTA panel for that case held that the law was not discriminatory because, in theory, that narrowly crafted language could apply in the future if another company proposed a similar project.

On the other hand, the extraordinary facts of the Keystone XL review process could end the United States’s NAFTA winning streak. First, throughout the seven-year review, President Obama repeatedly responded to complaints from pipeline supporters by admonishing them to remember “this is Canadian oil, this isn’t U.S. oil.” And the President’s administration was, at the same time, moving to expedite domestic oil pipelines. Second, after repeatedly delaying the decision on Keystone XL and repeated environmental impact studies, the U.S. denied the permit on the basis of a perception that was not supported by the seven years of analysis it had done. It will be difficult to explain why it took seven years to analyze the pipeline if, in the end, the government chose to ignore that analysis.

Finally, TransCanada’s lawsuits may operate in tandem because one relevant set of laws that Congress has passed concerning international energy trade is the set of laws approving and implementing NAFTA. In U.S. court TransCanada will argue that even if Congress has not prescribed a specific process for international oil pipelines, it has, at least ruled out any discriminatory or arbitrary treatment of Canadian investors in those pipelines. One of the chief challenges for U.S. lawyers will be to explain why the federal government should impose a uniquely lengthy and unpredictable process on Canadian oil pipelines while expediting domestic oil pipelines.

Regardless of the outcome, TransCanada’s Keystone XL challenges set the stage for potential blockbuster decisions that will have a lasting impact on energy, constitutional, and trade law.

 

You can see more legal documents & analysis related to the Keystone XL pipeline and other North American oil pipelines at Oil Transport Tracker (Shortcut link: http://j.mp/OilTransportTracker).

 


 

*Full disclosure: Before my academic career, I worked in private practice and represented TransCanada in two of these earlier cases. 

Supreme Court: EPA Should Have Considered Cost When Deciding Whether Mercury Limits For Power Plants Were Appropriate

Screen Shot 2015-06-29 at 9.19.29 PMToday the United States Supreme Court held that the Environmental Protection Agency (EPA) improperly refused to consider costs when determining whether it was “appropriate and necessary” to regulate mercury emissions from power plants under the Clean Air Act. Ultimately, EPA may be able to keep the same rules after going back and explaining why the cost of the regulations is justified in the circumstances. But the decision is an important victory for advocates of cost-benefit analysis and those who think environmental agencies should pay more attention to the costs of regulation.

Section 112 of the Clean Air Act directs EPA to regulate hazardous air pollutants from power plants if it finds “regulation is appropriate and necessary.” 42 U.S.C. §7412. EPA said that regulation was “appropriate and necessary” even without considering costs because 1) power plant emissions posed risks to human health and the environment that were not eliminated by other provisions of the Clean Air Act and 2) there were controls available to reduce those dangerous emissions. So there was no need for EPA to consider costs to make its initial decision to regulate, but it promised to consider costs when adopting the actual final regulations for power plants.

Although EPA said it ignored costs when it made its initial decision to regulate, it still estimated the costs and benefits of the final rules that it adopted. EPA estimated that its rules would cost power plants $9.6 billion dollars a year. EPA couldn’t estimate all the possible benefits of limiting mercury emissions, but the little it could quantify came to about $5 million a year—less than 0.1% of the cost of the rule. On the other hand, EPA said that cleaning up mercury would have massive side benefits: it would lower sulfur dioxide emissions and these reductions would be worth between $37 and $90 billion per year. So these ancillary benefits far outweighed the costs of EPA’s rule, but if you didn’t count them, EPA’s rule imposed costs far in excess of its benefits.

Justice Scalia, writing for a 5-4 majority, held that EPA must consider the costs of regulation before making its initial decision to regulate, reasoning that “No regulation is ‘appropriate’ if it does significantly more harm than good.” The four dissenters conceded that, generally speaking, “an agency must take costs into account in some manner before imposing significant regulatory burdens” but agreed with EPA’s argument that the agency could consider those costs later when adopting regulations for specific source categories.

The Supreme Court’s decision may not have much impact on mercury regulation. Power utilities are already complying with the mercury rules that the court struck down in this case. And the case will now go back to the appellate court, which could decide to leave the rules in place while the agency rethinks whether these rules are “appropriate and necessary” factoring in the costs that they impose. EPA already determined that the benefits of the rules far outweighed their costs if you consider ancillary benefits, so it will probably reach the same decision. On the other hand, the Court’s decision raises very important questions for the future.

First: Can agencies consider ancillary benefits? At oral argument, some justices seemed to suspect it was inappropriate to consider the benefits associated with pollutants other than mercury. After all, if the other pollutants are the problem, why not adopt regulations aimed at the other pollutants? On the other hand, it has long been standard practice for agencies to consider ancillary or “co-benefits” of reducing pollutants other than the main target of regulation. If an agency is going to consider all the important costs of a regulation, why shouldn’t it consider all the important benefits? In some ways, the mercury rule may just be an outlier case because EPA estimated that the co-benefits of reducing sulfur dioxide were 10,000 times greater than the direct benefits of reducing mercury itself. But over half of the benefits of EPA’s Clean Power Plan come from co-benefits in reducing pollution other than greenhouse gases, so the question does have wider importance.

Second: How much cost-benefit analysis will the Court require for other regulations? Today’s decision may be seen as part of a trend that is making cost-benefit analysis a kind of default background principle for agency decision-making. Just fourteen years ago, Justice Scalia wrote an opinion for eight justices, holding that EPA could not consider the cost of regulation when the Clean Air Act demanded a standard at the level “requisite to protect the public health.” In that case, Justice Scalia explained that EPA could consider costs later when it implemented the standard. Last year, the Court held that EPA could consider the cost of emissions controls when it decided whether a State “contributed significantly” to air pollution in another state; Justice Scalia dissented. Now, the Court holds that EPA must consider the cost of regulation when it determines whether regulation is “appropriate and necessary.” Justice Scalia writes the opinion, and all justices agree that EPA must consider costs at some stage. Observing this trend, litigants will feel increasingly bold to demand that EPA consider the costs at each stage of adopting new environmental regulations.

Supreme Court Leaves Room for State Regulation of Natural Gas Sales

Yesterday, the U.S. Supreme Court held that the federal Natural Gas Act does not preempt the field of state antitrust regulation of natural gas prices, which means states can apply their own policies to natural gas sales as long as those policies do not conflict with federal law.

Vanderbilt’s Jim Rossi has just posted an analysis of the case at SCOTUSblog. As he notes, U.S. courts have been struggling with how to draw a line between state and federal authority in both electricity and natural gas markets.

Under both the Natural Gas Act and the Federal Power Act, the federal government has authority over wholesale energy sales, while the states retain authority over retail sales of natural gas and electricity. As a result, the Supreme Court’s decision on the Natural Gas Act may have important implications for electricity markets as well. And it is another important precedent in the courts’ struggles to balance state’s traditional authority over their own energy markets with increasingly integrated interstate energy markets.

Professor Rossi writes:

According to the majority opinion, written by Justice Stephen Breyer and joined by five other Justices, the [Natural Gas Act] “was drawn with meticulous regard for the continued exercise of state power, not to handicap it or dilute it in any way.” Under Section 1(b) of the [Natural Gas Act], wholesale transactions fall squarely – and even exclusively — within the jurisdiction of federal regulators. For nearly seventy years, the Court has acknowledged the sharp clarity of this federal-state division of authority over wholesale and retail sales, sometimes even calling it a jurisdictional “bright line.”

… The difficult question this case presented was what to do when a practice affects both types of sales.

… Notwithstanding (somewhat confusing) language in the opinion that purports to place this matter on the state “side” of any dividing line, the majority questioned whether the [Natural Gas Act] contains any sharp dividing line at all: “Petitioners and the dissent argue that there is, or should be, a clear division between areas of state and federal authority in natural gas regulation. But that Platonic ideal does not describe the natural gas regulatory world.”

Here is Professor Rossi’s full post and here is the Supreme Court’s opinion.

U.S. Supreme Court Narrows Greenhouse Gas Rules: What It Means for the U.S. Climate Agenda

Today, in Utility Air Regulatory Group v. Environmental Protection Agency (EPA), the U.S. Supreme Court struck down a portion of the United States’ first regulations for greenhouse gas emissions from industrial sources. The Court held that the Environmental Protection Agency (EPA) may not apply its “Prevention of Significant Deterioration” (PSD) program to new industrial sources on the basis of their greenhouse gas emissions. Instead, EPA can only regulate greenhouse gas emissions from new sources that are already subject to the PSD program because they emit other pollutants.

This is the first Supreme Court decision on EPA’s authority to regulate greenhouse gases from industrial sources, so it has important implications for EPA’s future climate agenda—including its recently proposed rule for the electricity sector. And the varied opinions offered by the Supreme Court justices offer hints about how courts will approach the inevitable legal challenges to those regulations.

EPA’s PSD program has two basic requirements:

1) You need a permit before you build a new major industrial source of air pollution.

2) And to get a PSD permit, you must show that you are using the “best available control technology” for the air pollutants that you emit.

In this case, the Supreme Court held:

1) EPA may not require new sources to get a PSD permit simply because they will emit large amounts of greenhouse gases. The Court held that it would be unreasonable for greenhouse gases to trigger the permit requirement, because the PSD permit program is only meant to apply to the thousands of industrial sources that emit conventional pollutants, not the millions of sources that emit significant amounts of greenhouse gases.

2) But if a source needs a PSD permit anyway, because it emits other pollutants, then EPA may require it to adopt the “best available control technology” for greenhouse gases, along with other air pollutants.

I will not say anything more about the complexities of the decision, because I described them extensively in a previous post, which read the tea-leaves of oral argument in the case, and suggested the Supreme Court would reach exactly this compromise. So you can read that post both for a description of the statutory interpretation question and an explanation of the reasoning that the court eventually followed.

The most pressing question raised by the case today may be its implications for the United States’ future climate agenda, including EPA’s recently proposed rule for existing power plants. There are three important implications, and each could spell trouble for EPA’s climate agenda.

First, the Court suggested that one reason for rejecting EPA’s rule is that “it would bring about an enormous and transformative expansion in EPA’s regulatory authority without clear congressional authorization” because millions of sources would be subject to a greenhouse gas permit requirement. EPA, it is true, had suggested it would only regulate a reasonable number of them, but the court was not willing to leave that decision in the agency’s hands.  The court noted: “When an agency claims to discover in a long-extant statute an unheralded power to regulate a significant portion of the American economy, we typically greet its announcement with a measure of skepticism.”

This passage will trouble EPA. In the agency’s recent proposal to cap greenhouse gas emissions from state power sectors, which the agency calls the “Clean Power Plan,” the agency is using a long-ignored statutory provision, Clean Air Act §111(d), to overhaul the nation’s electricity sector. As noted in a previous post, §111(d) has rarely been used, and it is so obscure that when Congress passed the Clean Air Act amendments in 1990, no one even noticed that the House and Senate had passed two different versions. Talk about unheralded.

Second, the Court expressed some skepticism about controlling greenhouse gas emissions through energy efficiency, which is an important part of EPA’s climate agenda. Carbon dioxide, the most common greenhouse gas, is the inevitable result of burning fossil fuels. Clean combustion of clean fossil fuels emits carbon dioxide and water. And once carbon dioxide is emitted, it is hard to pull out of the air. So most attempts to limit carbon dioxide emissions are really attempts to limit fossil fuel combustion. The only other option is carbon capture and storage, which is usually too costly to be feasible. EPA’s Clean Power Plan and its guidance on what is the “best available control technology” under the PSD program both rely on encouraging energy efficiency.

But the Supreme Court was not willing to endorse this approach. First, it stated that it didn’t need to decide whether energy efficiency could be the “best available control technology” because EPA also said states could consider carbon capture and storage. Second, it said that even if EPA could mandate energy efficiency at new sources, it could not redesign the source, require it to consume less electricity, or otherwise micromanage industrial source proposals. In doing so, the Supreme Court handed industry arguments to use against regulators in permit proceedings.

A third important takeaway from the case is that Justice Scalia, the conservative justice that authored the Supreme Court’s opinion, was able to convince Justice Kennedy to join his opinion limiting EPA’s authority to regulate greenhouse gases. Justice Kennedy is generally considered the Court’s swing vote and he was a deciding vote on the Court’s 5-4 decision in Massachusetts v. EPA, which required EPA to consider the climate consequences of greenhouse gases from cars and trucks.

Justice Kennedy has seemed very supportive of EPA’s efforts to regulate greenhouse gases. At oral argument, he admonished industry’s lawyers that he would continue to follow “both the result and the reasoning” of Massachusetts v. EPA—and the reasoning of Massachusetts v. EPA stressed the possible benefits of greenhouse gas regulation. Until now, EPA may have been justified in believing that the Court’s swing justice would sympathize with the challenges they face in adapting the Clean Air Act to address global warming and give them the benefit of the doubt. But today’s decision shows that Justice Kennedy’s sympathy only goes so far: he is quite willing to strike down overly broad climate regulations. That may have much longer-term implications for EPA’s climate agenda—only the coming years will tell.

 


 

Full disclosure: Before entering my academic career in 2011, I represented some of the petitioners in their challenge to EPA’s regulations.

Greenpeace v. Canada: Symbolic Blow to the Nuclear Industry, Game-changer for Everyone Else?

  • Please welcome guest blogger, Martin Olszynski,  who is an Assistant Professor at the University of Calgary’s Faculty of Law. Martin has written extensively on environmental assessment, so I am delighted to publish his thoughts on the Federal Court of Canada’s recent decision in Greenpeace v. Canada, which may have important implications for several high-profile energy projects that are currently under consideration in Canada, as well as environmental assessment law in general.

By Martin Olszynski

In a rather lengthy (431 paragraphs) decision, the Federal Court of Canada agreed with Greenpeace and other environmental groups that portions of the Joint Review Panel report for the Darlington New Nuclear project proposed by Ontario Power Generation were inadequate. See Greenpeace Canada v. Canada (Attorney General), 2014 FC 463 (CanLII). Justice Russell held that the environmental assessment conducted by the Panel failed to comply with the Canadian Environmental Assessment Act, SC 1992 c 37 (essentially Canada’s version of the United States National Environmental Policy Act). Specifically and as further discussed below, there were gaps in the treatment of hazardous substances emissions and spent nuclear fuel, and a failure to consider the effects of a severe “common cause” accident such as the combined earthquake and tsunami that caused the Fukushima nuclear disaster.

As noted by the media, while the decision is of limited effect on a project already indefinitely postponed by the provincial government, “it is a symbolic blow to an industry coping with the public and political fallout from Japan’s 2011 Fukushima meltdown.” As further discussed below, the decision is also likely to have implications for environmental assessment in Canada generally and several other projects currently making their way through either the regulatory process or the courts, including three projects in Western Canada that have received international attention: Taseko’s New Prosperity mine, Enbridge’s Northern Gateway pipeline and Kinder Morgan’s Trans Mountain pipeline.

Background

In the fall of 2006 and under direction from the Ontario Minister of Energy, Ontario Power Generation applied to the Canadian Nuclear Safety Commission for a site preparation license for several new reactors at its existing Darlington nuclear plant in Bowmanville, Ontario. Application for this license, as well as for authorizations under the federal Fisheries Act RSC 1985 c F-14 and the Navigable Waters Protection Act RSC 1985 c N-22 (now the Navigation Protection Act), triggered the application of the-then CEAA (since replaced with the Canadian Environmental Assessment Act, 2012 SC 2012 c 19). The project was referred to a “joint review panel” in 2008 and a three-member panel was appointed in 2009. Following 284 information requests and seventeen days of hearings in the spring of 2011, the panel submitted its final report to the federal Minister of the Environment in August of that same year, concluding that the project was not likely to result in significant adverse environmental effects. Greenpeace and the other applicants challenged the adequacy of the environmental assessment and panel report shortly thereafter.

Justice Russell summarized the applicants’ argument as follows:

 [127] As identified in the Report, the [joint review panel] itself found that key information about the proposed Project was absent from the [environmental assessment] documentation. For example, the Panel found that no specific nuclear reactor technology, site design layout, cooling water option, used nuclear fuel storage option, or radioactive waste management option has been selected. Thus, at the present time, federal decision-makers still do not know: (a) the particulars of the specific project to be implemented at the Darlington site; (b) the full range of site-specific or cumulative environmental effects; or (c) whether there are feasible mitigation measures over the project’s full lifecycle. These and other fundamental gaps are attributable to the fact that what the [joint review panel] had before it was not a “project”, but merely a plan for future planning, assessment, and decision-making.

 (See paras 218 – 220 for the full list of alleged gaps and deficiencies)

The reason that so many project components remained unspecified was that Ontario Power Generation, with the panel’s blessing, had prepared its environmental impact statement based on a “plant parameter envelope” or “bounding scenario” approach. As described by Ontario, “this approach involves identifying the salient design elements of the Project and, for each of those elements, applying the ‘limiting value’ (the value with the greatest potential to result in an adverse environmental effect) based on the design options being considered” (at para 5). The respondents argued that such an approach was consistent with the requirement, pursuant to section 11 of the CEAA, to conduct the assessment as early as practicable in the planning process and before irrevocable decisions are made (at para 66), and further that it was supported by the case law (at para 72).

Decision

After a thorough review of the statutory regime and associated jurisprudence, Justice Russell concluded that there was nothing that precluded the adoption of the plant parameter envelope approach per se (at para 181). However, he did find inadequacies with the panel’s treatment of three specific issues (at para 228):

  • The failure of the Panel to insist on a bounding scenario analysis for hazardous substance emissions, in particular liquid effluent and stormwater runoff to the surface water environment, and for the sources, types and quantities of non-radioactive wastes to be generated by the project;
  • The Panel’s treatment of the issue of radioactive waste management; and
  • The Panel’s conclusion that an analysis of the effects of a severe common cause accident at the facility was not required at this stage, but should be carried out prior to construction.

In assessing these matters, Justice Russell accepted the applicants’ argument – unchallenged by the respondents and somewhat unique to the Canadian legislation and the broader Parliamentary context within which it operates – that the environmental assessment process under CEAA is fundamentally different from future licensing or regulatory processes (at para 230), and that there is therefore a limit as to the extent to which the consideration of environmental effects and their mitigation can be left to those later processes (Justice Russell described this as a matter of improper delegation):

[232] Under the CEAA, the ultimate decision-maker for projects referred to review panels is the Governor in Council (in practical terms, the federal Cabinet), which decides whether the responsible authorities will be permitted to take steps to enable the project to move forward. Parliament chose to allocate this decision to elected officials who are accountable to Parliament itself and, ultimately, to the electorate…

[235] The most important role for a review panel is to provide an evidentiary basis for decisions that must be taken by Cabinet and responsible authorities. The jurisprudence establishes that gathering, disclosing, and holding hearings to assemble and assess this evidentiary foundation is an independent duty of a review panel, and failure to discharge it undermines the ability of the Cabinet and responsible authorities to discharge their own duties under the Act [citing Pembina Institute for Appropriate Development v Canada (Attorney General), 2008 FC 302 (CanLII) at paras 72 – 74]…

[237] In short, Parliament has designed a decision-making process under the CEAA that is, when it functions properly, both evidence-based and democratically accountable. The CNSC [Canadian Nuclear Safety Commission], in considering future licensing decisions, will be in a fundamentally different position from the Panel that has conducted the EA. The CNSC will be the final authority making the decision, not merely an expert panel. Although the CNSC approaches this role with considerable expertise, it does not have the same democratic legitimacy and responsibility as the federal Cabinet.

(Emphasis added)

With respect to the respondent’s plant perimeter envelope approach, which the panel acknowledged was a departure from typical EA practices, this meant that it “was incumbent on the Panel to ensure the methodology was fully carried out” (at para 247), bearing in mind also the challenges that such an approach poses for public participation: “The less specific the information provided… the more difficult it may be for interested parties to challenge assumptions, test the scientific evidence, identify gaps in the analysis, and ensure their interests are fully considered” (at paras 247, 249).

Applying this standard to hazardous substance emissions and on-sitechemical inventories, Justice Russell concluded that the environmental assessment came up short. He noted Environment Canada’s submissions to the panel that, notwithstanding several information requests to Ontario Power Generation, the remaining gaps prevented the department from assessing effects with respect to effluent and storm water management (at paras 257 – 259). The panel itself noted that “[Ontario Power Generation] did not undertake a detailed assessment of the effects of liquid effluent and storm water runoff to the surface water environment” but that it “committed to managing liquid effluent releases in compliance with applicable regulatory requirements and to applying best management practices for storm water” and on this basis concluded that the project was not likely to result in significant adverse environmental effects (at paras 264, 265).

In a passage that is sure to interest administrative law scholars and practitioners (and discussed further below), Justice Russell held that while such a conclusion may be reasonable, it did not comply with CEAA:

[272] To repeat what is stated above, because of its unique role in the statutory scheme, a review panel is required to do more than consider the evidence and reach a reasonable conclusion. It must provide sufficient analysis and justification to allow the s. 37 decision-makers to do the same, based on a broader range of scientific and public policy considerations. One could say that the element of “justification, transparency and intelligibility within the decision-making process” (Dunsmuir, above, at para 47; Khosa, above, at para 59) takes on a heightened importance in this context.

[273] In this case, there are references to commitments by [Ontario Power Generation] to comply with unspecified legal and regulatory requirements or applicable quality standards, and to apply good management practices. There are references to instruments that may or may not contain relevant standards or thresholds based on the information before the Court (e.g. the Ontario Stormwater Management Planning and Design Manual (March 2003)). And there are references to thresholds or standards in statutory instruments (e.g. Fisheries Act, Canadian Environmental Protection Act) without specific information about how these are relevant to or will bound or control the Project’s effects…

[275] In essence, the Panel takes a short-cut by skipping over the assessment of effects, and proceeding directly to consider mitigation, which relates to their significance or their likelihood. This is contrary to the approach the Panel says it has adopted (see EA Report at p. 39), and makes it questionable whether the Panel has considered the Project’s effects at all in this regard.

(Emphasis added)

This is not to suggest that future regulatory processes “have no role to play in managing and mitigating a project’s environmental effects” (at para 241). For Justice Russell, a conceptual distinction can be made between two kinds of situations where a panel, despite some uncertainty, might conclude that significant adverse environmental effects are unlikely (at para 280):

(a)  Reliance upon an established standard or practice and the likelihood that the relevant regulatory structures will ensure compliance with it; or

(b)  Confidence in the ability of regulatory structures to manage the effects of the Project over time.

The latter approach is problematic in that it “may short-circuit the two-stage process whereby an expert body evaluates the evidence regarding a project’s likely effects, and political decision-makers evaluate whether that level of impact is acceptable in light of policy considerations, including “society’s chosen level of protection against risk” (at para 281, referring to the Government of Canada’s policy on the application of the precautionary principle and adopted by the Darlington panel).

Turning next to the issue of spent nuclear fuel, there does not appear to have been any real dispute between the parties that the panel’s treatment of this issue was cursory. Rather, the respondents’ position was that this was something that Canada had mandated the Nuclear Waste Management Organization (NWMO) to study. Justice Russell disagreed:

[297] In my view, the record confirms that the issue of the long-term management and disposal of the spent nuclear fuel to be generated by the Project has not received adequate consideration. The separate federal approvals process for any potential NWMO facility, which has not yet begun…will presumably ensure that such a facility is not constructed if it does not ensure safety and environmental protection. But a decision about the creation of that waste is an aspect of the Project that should be placed before the s. 37 decision-makers with the benefit of a proper record regarding how it will be managed over the long-term, and what is known and not known in that regard. (emphasis added)

According to Justice Russell, the management and storage of spent nuclear fuel was not a “separate issue” (at para 312). Rather, the environmental assessment “is the only occasion…on which political decision-makers at the federal level will be asked to decide whether that waste should be generated in the first place” (ibid). Nor was there anything in the Terms of Reference that suggested that this issue was not to be addressed (at para 313).

Finally, with respect to a severe “common cause” accident (e.g. as a result of both an earthquake and flooding), the problem was not that Ontario Power Generation failed to assess the risks of accidents associated with its new build (at para 327) but rather that it failed to assess these risks in conjunction with the existing Darlington plant. The panel itself recognized this gap and recommended an evaluation of “the cumulative effect of a common-cause severe accident involving all of the nuclear reactors in the site study area” prior to construction (Recommendation # 63). For Justice Russell, however, that was insufficient:

[334] In my view, the one conclusion that is not supported by the language of the statute is the Panel’s conclusion that the analysis had to be conducted, but could be deferred until later. Rather, in my view, it had to be conducted as part of the EA so that it could be considered by those with political decision-making power in relation to the Project.

In light of these three deficiencies, and as was the case in Pembina Institute cited above, the Court remitted the Report to the panel for further consideration, pending which the relevant government agencies have no jurisdiction to approve the project.

Discussion

Justice Russell’s thorough treatment of the federal environmental assessment regime means that the decision is likely to have implications going forward. This is so because, notwithstanding the fact that Greenpeace dealt with the prior CEAA regime and CEAA 2012 is in many ways different, the provisions dealing with a panel’s duties and political decision-making are effectively unchanged. These implications, as well as Justice Russell’s somewhat unprecedented but in my view correct approach to judicial review in this context, are further discussed below.

Failure to Assess Environmental Effects “Short-Circuits” the CEAA Regime

Perhaps the most important take-away message from Greenpeace is that, generally speaking, Panels must do the work of actually assessing potential environmental effects and their mitigation. This is a necessary consequence of CEAA’s two-step decision-making process, which Justice Russell describes as “evidence-based and democratically accountable.” Democratic accountability is hindered where the evidence with respect to potential adverse environmental effects is missing, inadequate or postponed to some future regulatory proceeding. This finding, supported by prior jurisprudence and the 2008 Pembina Institute decision in particular, is likely to cause problems for both Taseko’s proposed New Prosperity mine and Enbridge’s proposed Northern Gateway pipeline.

I have previously written about Taseko’s New Prosperity project here and here. Briefly, the second federal panel that reviewed Taseko’s revised project concluded – like the first one – that the project is likely to result in significant adverse environmental effects. In the first of my posts, I suggested that this result was at least partially its own undoing, and its refusal to provide sufficient information to the panel in particular. Like Ontario Power Generation, Taseko was of the view that such “details” could be dealt with at the regulatory phase (see e.g. its final written submissions to the panel at p 8 – 11), an approach that the New Prosperity panel ultimately rejected (see New Prosperity Report at p 22). In its December 2013 application for judicial review, Taseko argues, inter alia, that the panel erred in law when it did so. Greenpeace suggests that this aspect of Taseko’s challenge is unlikely to succeed.

Greenpeace also lends support to the recent letter to the Prime Minister, signed by 300 scientists, which urges him to reject the Northern Gateway Joint Review Panel report. Amongst five major flaws, the signatories to the letter allege inappropriate reliance on yet-to-be-developed mitigation measures:

…Northern Gateway omitted specified mitigation plans for numerous environmental damages or accidents. This omission produced fundamental uncertainties about the environmental impacts of Northern Gateway’s proposal (associated with the behaviour of bitumen in saltwater, adequate dispersion modeling, etc…). The panel recognized these fundamental uncertainties, but sought to remedy them by demanding the future submission of plans… Since these uncertainties are primarily a product of omitted mitigation plans, such plans should have been required and evaluated before the [panel] report was issued.

Whether or not the foregoing is an accurate characterization of the JRP’s conclusions and recommendations (a quick glance of the National Energy Board’s 209 conditions does suggest that these scientists are likely onto something), the letter’s characterization of the environmental assessment process as one intended to offer “guidance, both to concerned Canadians in forming their opinions on the project and to the federal government in its official decision” (at page 3) could have been written by Justice Russell himself.

What is Separate?

A related aspect of Greenpeace worth discussing is the Court’s approach to the management of spent nuclear fuel. As noted above, Justice Russell concluded that this was not a separate issue, and that the “creation of nuclear waste” was “an aspect of the Project that should be placed before [Cabinet]” (at para 297).

Such dicta could prove useful to those, such as the City of Vancouver in the context of the National Energy Board’s Trans Mountain pipeline application, arguing that the environmental assessments for major pipelines (including Northern Gateway) should assess the climate change implications of the increased oil production enabled by the construction of such pipelines (in its application, Trans Mountain states that the pipeline is in response to requests for increased capacity “in support of growing oil production”). Although the matter is not free from doubt, the statutory language on this front certainly is broad (see CEAA, 2012 para 5(1)(a): “…a change that may be caused…”). It also seems plain that panels cannot arbitrarily decide to exclude certain environmental effects, nor is deference to government policy or other initiatives appropriate (e.g. the NWMO in Greenpeace, or the Province of Alberta’s intensity-based regulatory approach to greenhouse gas emissions in Pembina Institute).

Assessing the climate change effects of increased oil production would not amount to “a trial of modern society’s reliance on hydrocarbons,” as the National Energy Board’s outgoing chief recently stated in an interview with the Financial Post, and which he described as a policy question belonging “to the world of policy-making and politics, in which we are not involved at all.” With respect to its obligations under CEAA, 2012 at least (recognizing that the Board is dealing with a dual mandate here, the other coming from s 52 of the National Energy Board Act RSC 1985 c N-7 and which does actually require it to reach a conclusion with respect to the public interest), it would be the exact opposite. Although complex, it would entail an evidence-based analysis of whether Trans Mountain or Northern Gateway may contribute to an increase in oil production and, if so, the greenhouse gas emissions associated with that. Importantly, the final Environmental Impact Statement for Keystone XL determined that this was not likely to be the case for that particular pipeline.

A Green Shade of Reasonableness Review?

In the final part of this post, I want to briefly discuss Justice Russell’s approach to reasonableness review. For convenience, the relevant passage is as follows:

[272] To repeat what is stated above, because of its unique role in the statutory scheme, a review panel is required to do more than consider the evidence and reach a reasonable conclusion. It must provide sufficient analysis and justification to allow the s. 37 decision-makers to do the same, based on a broader range of scientific and public policy considerations. One could say that the element of “justification, transparency and intelligibility within the decision-making process” (Dunsmuir, above, at para 47 [this case sets out a doctrine of deference to administrative agencies somewhat similar to Chevron]; Canada (Citizenship and Immigration) v. Khosa, 2009 SCC 12 (CanLII) at para 59) takes on a heightened importance in this context. (emphasis added)

In my view, this is precisely the kind of analysis that Justice Binnie had in mind when he stated, at para. 59 of Kosa, that “[r]easonableness is a single standard that takes its colour from the context.” In the environmental assessment context, judicial review is not available on the merits of government-decision making – as Justice Russell observed that is a matter of democratic accountability. In this context, judicial review should function in the service of democratic accountability by ensuring the integrity of the decision-making process, a process that government predictably and – where it has been adequate – justifiably relies on to gain support for its political decisions. In the context of Northern Gateway, for example, the Prime Minister and then Minister of Natural Resources Joe Oliver were reported as saying that they will “make a decision only after considering the recommendations of the ‘fact-based’ and ‘scientific’ review panel.” Mr. Oliver also released a statement where he described the panel report as “a rigorous, open and comprehensive science-based assessment.” In this context, the role of a reviewing court should be to ensure that the environmental assessments do in fact meet these standards, failing which there can be no democratic accountability.

An earlier version of this post appeared at ABlawg, the University of Calgary Faculty of Law blog.